Clumber Drive

Radcliffe Culvert, Clumber Drive

The project involved accessing the culvert through a small opening cut into the homeowner’s driveway. This enabled the use of a robotic aqua cutter to break down the hardened concrete.

Radcliffe Culvert, Clumber Drive

Project Overview

Key Details
  • Client William Davis Ltd
  • Project value £160k
  • Date 2025
  • Expertise Infrastructure / small works
  • PDF Case Study Case study
homeowners driveway
During
pipeworks
Clumber Drive
After

What do our customers say about us?

‘The teams were consistently punctual and adhered to all agreed timelines, including the considerate scheduling of heavy equipment usage. Their professionalism was evident throughout the project—they were helpful, respectful, and maintained a tidy site, especially at the end of each working day. Safety was clearly a top priority, and we always felt confident that the site was being managed responsibly.
We were particularly impressed by the team’s commitment to quality and their determination to deliver the best possible outcome. This was especially true of Tommy, whose dedication stood out. We had complete peace of mind knowing that our property would be left in the same excellent condition as when the work began.
Finally, we would like to extend our thanks to Danaher & Walsh for addressing and clearing the oil spill caused by a tanker from another company. Your professionalism and care did not go unnoticed, and we are truly grateful.’

The homeowner in Radcliffe, clumber drive

Right Arrow Down Arrow List Tick Left Arrow