Pipeline

Gravity Overland Sewer Main needed Replacing from the Chamber to the Discharge

This ambitious project involved replacement of approximately 110 metres of 300mm ductile iron sewer main, stretching from an inspection chamber to the discharge point at a treatment works.

Gravity Overland Sewer Main needed replacing from the Chamber to the Discharge.

Key Details
  • Client Anglian Water
  • Expertise Pipelining and Infrastructure
  • PDF Case Study Case study

Right Arrow Down Arrow List Tick Left Arrow