Foxall Road Sewer Repair

Innovative ‘No-dig’ sewer repair adjacent to electrical substation

Using our ‘no-dig’ technology we successfully repaired a complicated collapse at 6m depth in residential area laden with services

Foxall Road Sewer Repair

Innovative ‘No-dig’ sewer repair adjacent to electrical substation

Using our ‘no-dig’ technology we successfully repaired a complicated collapse at 6m depth in residential area laden with services

Foxall Road Sewer Repair

Innovative ‘No-dig’ sewer repair adjacent to electrical substation

Using our ‘no-dig’ technology we successfully repaired a complicated collapse at 6m depth in residential area laden with services

No-dig sewer repair adjacent to an electric sub station

Project Overview

Danaher & Walsh Advanced Pipeline Solutions is on a long-term framework for Anglian Water, along with several other companies that make up the IMR WR Alliance.

This particular job was so complex that Anglian Water asked our ‘no-dig’ team to find a trenchless solution to this challenging repair.

The Challenge

The lateral had collapsed where it met the mainline sewer at a depth of 6m. The area was ridden with services as it was in a highly residential area and right next to an electrical substation which would have made a traditional dig repair virtually impossible – it would certainly have been dangerous and would have entailed long-road closures for the residents.

Danaher & Walsh solution to complicated sewer collapse

The Danaher & Walsh no-dig solution was to cut out a new connection for the lateral to come into and to put a patch into the main line – thus avoiding having to interfere with the collapse in the mainline and creating a new fully-sealed junction instead.

A no-dig solution meant that the job could be completed quickly and safely.

Outcomes

Utilising our innovative ‘no-dig’ technology, we were able to access the pipes, widen the area where the previous repair had taken place, cut out the patch, introduce a liner and make the new junction fully secure at 6 inches.

The time taken to complete this repair was just one week and avoided the massive health and safety issues that a more traditional dig method would have incurred.

The client was delighted with the results.

Key Details
  • Client Anglian Water
  • Expertise Pipelining
  • PDF Case Study Case study

These images show the difficult access and complicated network of services, plus some screen grabs showing before and after our no-dig works.

Video footage :- Before, during and after the repair

1. Mainline Pre survey footage
2. Mainline Survey after new lateral cut footage
3. Mainline new connection, cutting patch footage
4. Mainline liner through new connection footage
7. Lateral first-view with cutter [cutter-cam]
5. Mainline post-survey footage
8. Lateral before liner footage
6. Lateral pre-survey footage
9. Lateral post-survey clean footage
Right Arrow Down Arrow List Tick Left Arrow